ADU pricing

What an ADU costs in Los Angeles, all in.

Most ADU bids start from a price per square foot, set before anything is designed, and grow as decisions get made. We publish our prices. Here is what each model costs, what the price covers, and what we price after we see your lot.

Prices by model

$165,000 to $360,000, depending on the model.

ModelRoomsSizeStarting price
Model SStudio, 1 bath325 sq ft$165,000
Model 11 bed, 1 bath497 sq ft$195,000
Model 22 bed, 1-2 bath749 sq ft$270,000
Model 33 bed, 2 bath996 sq ft$360,000

Starting prices are all-in for design, permitting and construction with standard finishes. Finish upgrades and site work are priced on top, and you see both before you sign. City permit fees are billed at cost. Model 1 and Model 2 are approved standard plans in the City of Los Angeles.

Buildoly Model S ADU exterior, Luxe finish
Studio, 1 bath · 325 sq ft
From $165,000
Studio-sized, for a home office or guest room.
Buildoly Model 1 ADU exterior, Luxe finish
1 bed, 1 bath · 497 sq ft
From $195,000
One-bedroom, ideal as a rental or a home for aging parents.
Buildoly Model 2 ADU exterior, Luxe finish
2 bed, 1-2 bath · 749 sq ft
From $270,000
Two-bedroom, room to spread out for your growing family.
Buildoly Model 3 ADU exterior, Luxe finish
3 bed, 2 bath · 996 sq ft
From $360,000
Three-bedroom, a complete home, not an add-on.

What the price covers

What's in the price, and what we price after the site visit.

Included in the starting price
  • Design: stamped architectural and structural plans, and the Title 24 energy report
  • Permits: we prepare the submittal and run it with the city through approval
  • Standard finishes, with optional upgrades
  • Slab-on-grade foundation
  • Equipment, labor and materials for typical utility connections
  • Construction by a licensed contractor: framing, plumbing, electrical, insulation, roofing and finish installation
  • A one-year workmanship warranty
Priced after the site assessment
  • Utility upgrades, such as a larger electric service or a new water line
  • Foundation work beyond a standard slab
  • Demolition of existing structures
  • Site clearing
  • Landscaping
  • Any finish upgrades you choose

Site work

What can change the number for your lot.

Site work and utilities generally run $15,000 to $35,000. These are the items we look for on the site assessment, and each one is priced before you sign, not discovered during construction.

Electric panel

Most homes have a 100 amp panel. Running a house and an ADU usually takes 200 amps, so many lots need an upgrade.

Fire sprinklers

Some lots require sprinklers, which can also mean a larger water line to the property.

Methane mitigation

Lots near an oil well can need methane mitigation before the slab goes in.

Slope

We build on sloped lots. Grade changes the foundation and retaining work, and we price it after the assessment.

Septic

We can tie into an existing septic system. A capacity evaluation, and any upgrade it calls for, are arranged and paid for separately.

Existing structures

Removing a garage, shed or slab to make room is priced as demolition and site clearing.

City fees

What the city charges for an ADU permit.

City permit fees are not in our price. Your city sets them, and we bill them to you at cost. They cover the city's plan check and permit issuance, plus impact fees on an ADU over 750 sq ft. The amounts vary by city; these are the typical totals for each model.

Model S · 325 sq ft

Typically $3,000 to $8,000

Plan check and permit issuance. Under 750 sq ft, so no impact fees.

Model 1 · 497 sq ft

Typically $3,000 to $8,000

Plan check and permit issuance. Under 750 sq ft, so no impact fees.

Model 2 · 749 sq ft

Typically $5,000 to $10,000

Plan check and permit issuance. Under 750 sq ft, so no impact fees.

Model 3 · 996 sq ft

Typically $8,000 to $15,000

Plan check and permit issuance, plus impact fees where your city charges them, since it is over 750 sq ft.

The 750 sq ft line

Model S, Model 1 and Model 2 are all under 750 sq ft, so no city can charge them impact fees. School district fees and utility connection fees are separate and can still apply.

From January 1, 2027 (SB 1117), an ADU over 750 sq ft pays impact fees only on the area above 750 sq ft, in proportion to the main house, for up to two ADUs on a lot. What changes on January 1

ADU rules and permit offices by city

Each city page covers that city's ADU rules and who issues the permit.

Paying for it

$1,000 to start. The rest as the work gets done.

Your $1,000 reserves your build slot and is credited in full to your contract. It's refunded if your city won't permit an ADU on your lot, or if your financing doesn't come through within 60 days.

  • $8,000 when you approve the design: site plan, floor plan and elevations
  • $12,000 when the engineered permit set is complete, before it goes to the city
  • $30,000 when the city issues your permit
  • The balance in six payments during construction, each due when a stage is done or an inspection passes, from excavation through final inspection
Financing

Many of our clients finance the whole build. Our lending partners can finance up to 100% of it, subject to credit approval, and a HELOC or home equity loan works too.

Check your estimated rate in about a minute.

Pricing questions

What people ask before they sign.

More answers on our FAQ · ADUs by city

See the price for your lot.

Pick a model and tell us your address. After the site assessment you get one all-in number, before you sign.