ADUs in Santa Ana

Backyard homes for Santa Ana, priced before you sign.

We design, permit and build standard ADU models across Orange County, Santa Ana included. You pick a model, we assess your lot, and you get one all-in price before you sign.

★ 4.9 on Google · 25+ reviewsCSLB License #1134744Design, permits and construction from one team

The models

Four standard homes, each with a price up front.

Starting prices include design, permitting and construction with standard finishes. Site work and utilities generally run $15,000 to $35,000 and are priced after we see your lot, and city permit fees are billed at cost. Model S, Model 1 and Model 2 are all 800 sq ft or less, so they fit even when the lot also gets a junior ADU. See what's included.

Buildoly Model S ADU exterior, Luxe finish
Studio, 1 bath · 325 sq ft
From $165,000
Studio-sized, for a home office or guest room.
Buildoly Model 1 ADU exterior, Luxe finish
1 bed, 1 bath · 497 sq ft
From $195,000
One-bedroom, ideal as a rental or a home for aging parents.
Buildoly Model 2 ADU exterior, Luxe finish
2 bed, 1-2 bath · 749 sq ft
From $270,000
Two-bedroom, room to spread out for your growing family.
Buildoly Model 3 ADU exterior, Luxe finish
3 bed, 2 bath · 996 sq ft
From $360,000
Three-bedroom, a complete home, not an add-on.

Around Orange County

Buildoly projects across Orange County.

Each pin is a Buildoly project in Orange County. See the full map.

Santa Ana ADU rules in plain English

What you can build in the City of Santa Ana.

The basics for a single-family lot in Santa Ana, under the ADU rules the City updated in 2025. Santa Ana is rewriting its zoning code in a citywide update that hasn't been adopted yet, so we confirm the rules in effect for your address when you apply.

How many

One ADU and a junior ADU

Under the City's ordinance, a single-family lot can have one ADU plus one junior ADU in the house, and an attached garage counts as part of the house. State law can allow other combinations, and we check which path fits your lot.

SAMC 41-194.2(C), (G); Gov. Code 66323
Size

Up to 1,000 sq ft

An attached or detached ADU can be up to 1,000 sq ft, or 800 sq ft if the lot also gets a junior ADU. An attached ADU is also held to half the house's living space, but can always be at least 800 sq ft.

SAMC Table 41-194.3; 41-194.3(A), (B)
Setbacks

4 ft from the side and rear

That applies to an attached or detached ADU; a junior ADU follows the house. An ADU rebuilt in the same place and size as a structure torn down to make room for it needs no setback.

SAMC Table 41-194.3; 41-194.3(G)
Conversions

No size limit to convert

Converting an existing accessory building or part of the house has no size limit, and an existing accessory building can grow by up to 150 sq ft without meeting the standards for a new ADU.

SAMC 41-194.3(C), (D)
Apartment lots

Up to eight detached ADUs

On a lot with an apartment building, you can convert non-living space into at least one ADU and up to a quarter of the unit count, plus up to eight detached ADUs, never more than the units already there. A planned apartment building can add up to two detached ADUs.

SAMC 41-194.2(D)-(F)
Renting and selling

Rent it, don't sell it separately

An ADU can be rented, but generally not as a short-term rental of 30 days or less. It can't be sold apart from the house unless a qualified nonprofit built both under an affordable housing agreement with the City.

Gov. Code 66323(e); SAMC 41-194.2(H)
Worth knowing in Santa Ana

Every ADU and junior ADU must be at least 220 sq ft.

We confirm the height limit, the front setback and any parking requirement with the City for your lot before we price anything.

Changing on January 1, 2027

SB 1117 limits the impact fee on an ADU over 750 sq ft to the area above 750 sq ft, in proportion to the main house, for up to two ADUs on a lot. ADUs of 750 sq ft or less still pay no impact fee.

AB 956 lets you build two new detached ADUs on a single-family lot through the state's approval path. On that path a city can cap each one at 800 sq ft.

What changes for ADUs on January 1, 2027

Sources: Santa Ana Municipal Code 41-194.2 and 41-194.3 (with Table 41-194.3), as amended by Ordinance No. NS-3076, in effect March 6, 2025; City of Santa Ana, Comprehensive Zoning Code Update; California Government Code sections 66310 to 66342; SB 1117 and AB 956 (2026). Checked November 2026.

How it works

From your lot to move-in.

Step 1

Pick a model

Choose a model and finishes online, or book a free consultation to talk it through.

Step 2

Site assessment

We visit your lot, check utilities, access and the City's rules, and give you one all-in price before you sign.

Step 3

Design and permits

We finish the plans and run the permit with the City of Santa Ana's Planning and Building Agency from submittal to approval.

Step 4

Build and move in

We build on site and manage the job through final inspection and your certificate of occupancy.

Typical timeline: 8 to 12 months from start to finish. About 1 month of design, 2 to 4 months of permits and 3 to 5 months of construction. Your lot and the City's review times can move it.

Santa Ana ADU questions

What Santa Ana homeowners ask us.

More answers on our FAQ

Where we build

We also build in these cities.

Each city page covers that city's ADU rules and who issues the permit. All cities.

See your price for a Santa Ana ADU.

Pick a model and tell us your address. After the site assessment you get one all-in number, before you sign.