ADUs in Altadena

An ADU for your Altadena lot, priced before you sign.

We design, permit and build standard ADU models in Altadena and across LA County. If you lost your home in the Eaton fire, the ADU can be finished first, and your family can live in it while the house is rebuilt.

★ 4.9 on Google · 25+ reviewsCSLB License #1134744Four models from 325 to 996 sq ft

The models

Four standard homes, each with a price up front.

Starting prices include design, permitting and construction with standard finishes. Site work and utilities generally run $15,000 to $35,000 and are priced after we see your lot, and County permit fees are billed at cost. See what's included.

Buildoly Model S ADU exterior, Luxe finish
Studio, 1 bath · 325 sq ft
From $165,000
Studio-sized, for a home office or guest room.
Buildoly Model 1 ADU exterior, Luxe finish
1 bed, 1 bath · 497 sq ft
From $195,000
One-bedroom, ideal as a rental or a home for aging parents.
Buildoly Model 2 ADU exterior, Luxe finish
2 bed, 1-2 bath · 749 sq ft
From $270,000
Two-bedroom, room to spread out for your growing family.
Buildoly Model 3 ADU exterior, Luxe finish
3 bed, 2 bath · 996 sq ft
From $360,000
Three-bedroom, a complete home, not an add-on.

After the Eaton fire

Live in your ADU while the house is rebuilt.

On a lot where the house was destroyed or substantially damaged in the Eaton fire, the ADU can be finished and occupied before the new house. In unincorporated LA County, which includes Altadena, your household can live in it until January 7, 2030 while you rebuild. When the house goes up, the ADU stays, with no further review.

Executive Order N-9-25, in effect until January 16, 2028 unless ended earlier; LA County Planning Interpretation No. 2025-04.

County permit fees, deferred

If you owned and lived in your home on or before January 7, 2025, LA County defers its plan review, permit and inspection fees for your rebuild, including an ADU, and doesn't collect them later. It covers your primary residence only. Rentals and LLC-owned lots don't qualify, and school district and utility fees aren't included.

The County's fee deferral details · Your rebuild options

Around Altadena

Buildoly projects in Altadena and east Pasadena.

Each pin is a Buildoly project near Altadena: 3 design-and-build and 3 design-only. See the full map.

Altadena ADU rules in plain English

What you can build in unincorporated LA County.

Altadena is unincorporated, so LA County's ADU rules apply. These are the basics for a single-family lot. Every lot is different, so we confirm each of these for your address before we price anything.

How many

Two ADUs and a junior ADU

On a single-family lot: one ADU attached to or inside the house or garage, one detached ADU, and one junior ADU inside the house.

LA County Code 22.140.640.E, Table 22.140.640-A
Size

Up to 1,200 sq ft

One cap for attached and detached ADUs. All four of our models fit under it.

LA County Code 22.140.640.G.1.a.ii(1)
Setbacks and height

4 ft from the side and rear

Up to 25 ft tall. Where a community standards district sets a lower height, that limit applies, but a detached ADU can always be at least 16 ft.

LA County Code 22.140.640.G.1.b, G.1.c.iii(1)
Fire zones

800 sq ft is still allowed

If any part of your lot is in a Very High Fire Hazard Severity Zone, state law still allows one detached ADU of up to 800 sq ft, up to 16 ft tall, with 4 ft side and rear setbacks. A larger ADU there needs the vehicle access the County requires. Model S, Model 1 and Model 2 are all under 800 sq ft.

LA County Code 22.140.640.C.1, H; Gov. Code 66323(a)(2)
Parking

None outside very high fire zones

Outside a Very High Fire Hazard Severity Zone, no parking is needed. Inside one, the County asks for parking unless an exception applies, such as a half-mile walk to transit. A detached ADU of up to 800 sq ft under state law needs none.

LA County Code 22.140.640.G.1.d
Owning and renting

Rent it, don't sell it separately

The County doesn't require you to live on the property to have an ADU. It can't be sold apart from the house, and a unit approved under the state's streamlined rules can't be rented for 30 days or less.

LA County Code 22.140.640.F.1, I; Gov. Code 66323(e)
Changing on January 1, 2027

SB 1117 limits the impact fee on an ADU over 750 sq ft to the area above 750 sq ft, in proportion to the main house, for up to two ADUs on a lot. ADUs of 750 sq ft or less still pay no impact fee.

AB 956 lets you build two new detached ADUs on a single-family lot through the state's approval path. On that path the County can cap each one at 800 sq ft.

What changes for ADUs on January 1, 2027

Sources: Los Angeles County Code 22.140.640; California Government Code sections 66310 to 66342; Executive Order N-9-25 (January 16, 2025); LA County Planning Interpretation No. 2025-04; SB 1117 and AB 956 (2026). Checked November 2026.

How it works

From your lot to move-in.

Step 1

Pick a model

Choose a model and finishes online, or book a free consultation to talk it through.

Step 2

Site assessment

We visit your lot, check utilities, access and the County's rules, including fire zone limits, and give you one all-in price before you sign.

Step 3

Design and permits

We finish the plans and run the permit with LA County from submittal to approval.

Step 4

Build and move in

We build on site and manage the job through final inspection and your certificate of occupancy.

Typical timeline: 8 to 12 months from start to finish. About 1 month of design, 2 to 4 months of permits and 3 to 5 months of construction. Your lot and the County's review times can move it.

Altadena ADU questions

What Altadena homeowners ask us.

Rebuilding your home after the fire · More answers on our FAQ

Where we build

We also build in these cities.

Each city page covers that city's ADU rules and who issues the permit. All cities.

See your price for an Altadena ADU.

Pick a model and tell us your address. After the site assessment you get one all-in number, before you sign.