ADUs in San Diego

Backyard homes for San Diego, priced before you sign.

We design, permit and build standard ADU models in the City of San Diego and across San Diego County. You pick a model, we assess your lot, and you get one all-in price before you sign.

★ 4.9 on Google · 25+ reviewsCSLB License #1134744Design, permits and construction from one team

The models

Four standard homes, each with a price up front.

Starting prices include design, permitting and construction with standard finishes. Site work and utilities generally run $15,000 to $35,000 and are priced after we see your lot, and city permit fees are billed at cost. Model S, Model 1 and Model 2 are all 800 sq ft or less, small enough for San Diego's exemption from lot coverage and floor area limits. See what's included.

Buildoly Model S ADU exterior, Luxe finish
Studio, 1 bath · 325 sq ft
From $165,000
Studio-sized, for a home office or guest room.
Buildoly Model 1 ADU exterior, Luxe finish
1 bed, 1 bath · 497 sq ft
From $195,000
One-bedroom, ideal as a rental or a home for aging parents.
Buildoly Model 2 ADU exterior, Luxe finish
2 bed, 1-2 bath · 749 sq ft
From $270,000
Two-bedroom, room to spread out for your growing family.
Buildoly Model 3 ADU exterior, Luxe finish
3 bed, 2 bath · 996 sq ft
From $360,000
Three-bedroom, a complete home, not an add-on.

Around San Diego

Buildoly projects in San Diego County.

Each pin is a Buildoly project in the San Diego area. See the full map.

San Diego ADU rules in plain English

What you can build in the City of San Diego.

The basics for a single-family lot in the City of San Diego, outside the Coastal Overlay Zone. Every lot is different, so we confirm each of these for your address before we price anything.

Size

Up to 1,200 sq ft

A new attached or detached ADU can be up to 1,200 sq ft, and its floor area counts toward your lot's floor area limit, which on many lots is what really sets the size. One ADU of 800 sq ft or less is exempt from that limit and from lot coverage, front setback and open space rules.

SDMC 141.0302(b)(4), (b)(7)
Setbacks

Often none at the side and rear

An ADU 16 ft tall or less needs no side or rear setback, except in a high fire hazard zone, where it's 4 ft. A taller ADU needs up to 4 ft along a line shared with a residential neighbor. Fire code spacing between buildings still applies.

SDMC 141.0302(b)(9)
Height

Your zone's limit, two stories

An ADU follows the height limit of your base and overlay zones. On a single-family lot, a detached ADU can be up to two stories.

SDMC 141.0302(b)(8)
Parking

None, almost everywhere

The City requires no parking for an ADU. The exception is a lot in the Beach Impact Area that's outside a transit priority area, where one space is required unless an exception applies, such as an ADU of 500 sq ft or less.

SDMC 141.0302(b)(10)
Living on site

Not required

You don't have to live on the property to build or rent an ADU. A junior ADU only requires you to live there if it shares a bathroom with the house.

SDMC 141.0302(b)(11); Gov. Code 66333(b); IB 400
Renting and selling

Rent for 31 days or more

An ADU can't be rented for less than 31 consecutive days. San Diego also lets an ADU be converted into a condominium and sold separately, under the conditions in the code. A junior ADU can't be sold separately.

SDMC 141.0302(a)(8), (c)(1)(D), (f)
Worth knowing in San Diego

Near the coast: the City's 2025 and 2026 ADU amendments don't apply inside the Coastal Overlay Zone until the Coastal Commission certifies them, so a coastal lot can still be under older rules. We check which version applies to your address.

ADU Home Density Bonus: on top of the ADUs above, the City allows bonus ADUs when you also build ADUs deed restricted as affordable. On a single-family lot the total of ADUs and junior ADUs is capped at 4, 5 or 6 depending on lot size, and the program doesn't apply in some zones or on some lots in high fire hazard areas.

Changing on January 1, 2027

SB 1117 limits the impact fee on an ADU over 750 sq ft to the area above 750 sq ft, in proportion to the main house, for up to two ADUs on a lot. ADUs of 750 sq ft or less still pay no impact fee.

AB 956 lets you build two new detached ADUs on a single-family lot through the state's approval path. On that path a city can cap each one at 800 sq ft.

What changes for ADUs on January 1, 2027

Sources: San Diego Municipal Code 141.0302, as amended through Ordinance O-22109, in effect July 15, 2026; City of San Diego Information Bulletin 400 (January 2026); HCD findings letter to the City of San Diego of October 6, 2025; California Government Code sections 66310 to 66342; SB 1117 and AB 956 (2026). Checked October 2026.

How it works

From your lot to move-in.

Step 1

Pick a model

Choose a model and finishes online, or book a free consultation to talk it through.

Step 2

Site assessment

We visit your lot, check utilities, access and the City's rules, and give you one all-in price before you sign.

Step 3

Design and permits

We finish the plans and run the permit with the City of San Diego's Development Services Department from submittal to approval.

Step 4

Build and move in

We build on site and manage the job through final inspection and your certificate of occupancy.

Typical timeline: 8 to 12 months from start to finish. About 1 month of design, 2 to 4 months of permits and 3 to 5 months of construction. Your lot and the City's review times can move it.

San Diego ADU questions

What San Diego homeowners ask us.

More answers on our FAQ

Where we build

We also build in these cities.

Each city page covers that city's ADU rules and who issues the permit. All cities.

See your price for a San Diego ADU.

Pick a model and tell us your address. After the site assessment you get one all-in number, before you sign.